In this article
The primary bathroom is the room many homeowners picture first: a deep tub, a large shower, warm stone, soft light. It is also the room with the most decisions hidden inside the walls and floor. Plumbing, drains, waterproofing, blocking, and electrical all need to be in the right place before the finishes go in, and moving them later is expensive.
On a custom home, the primary bathroom is one of the most expensive rooms on the floor plan. The house plans should lock the plumbing before anyone chooses the stone.
Here are the decisions I work through with clients before construction starts.
Layout and privacy
Start with how the room is used. Do two people get ready at the same time? Is the toilet in its own room or behind a partial wall? Does the bathroom connect directly to the closet? Where does the door swing, and what do you see from the bedroom when it is open?
A separate toilet room is one of the most requested features in primary baths. It needs its own ventilation and a door, and it takes space, so it is worth deciding early.
Shower and tub
- Shower size: codes set a minimum, but a comfortable primary shower is usually much larger. Decide on size, door or no door, and bench before framing.
- Curbless entry: a shower with no step needs the floor framing or slab recessed so the shower floor can slope to the drain. This has to be planned with the structure.
- Drain type: a linear drain allows a single slope across the floor and works well with large tile.
- Valve and head locations: place the controls so you can turn the water on without getting wet, and decide on rain heads, handhelds, and body sprays early.
- Tub: stone and cast tubs are heavy when filled. Large ones may need a structural check, and the drain location must be fixed in the floor.
Niches, tile, and waterproofing
Shower niches look simple but need planning. They should sit on an interior wall, not an exterior one, so insulation isn't lost, and their size should line up with the tile layout. Choose your main tile before framing if you can, so niche heights and widths match full tiles instead of awkward cuts.
Waterproofing is the part you never see and the most important. Make sure the drawings or specifications call for a complete system in the shower and around the tub, not just at the floor.
Vanity, storage, and outlets
Double vanities need about 60 inches or more to feel comfortable. Drawers are more useful than doors for daily items. Plan an outlet inside a drawer for a hair dryer or toothbrush so the counter stays clear, and decide if you want a medicine cabinet recessed into the wall, which needs a wall without plumbing or ducts.
Light, air, and comfort
- Lighting: place light at face height on both sides of the mirror, or above it, to avoid shadows. Add a dimmable general light and a low night light. I explain layering in Planning Lighting Before Construction: Layers, Switches, and Fixtures.
- Ventilation: a quiet exhaust fan vented to the outside, sized for the room, protects finishes from moisture.
- Heated floors: they need a dedicated circuit and a thermostat location, so decide before the electrical rough-in.
- Daylight and privacy: high windows, frosted glass, or a skylight give daylight without losing privacy.
Decide the layout, shower and tub details, niches, waterproofing, outlets, lighting, ventilation, and heated floors before construction. The finishes are easy to choose once everything behind them is in the right place.
Want to see your bathroom before it's built?
My custom home packages include floor plans, electrical design, and 3D views, so every fixture and light is placed before construction begins.
Arch Design by B, LLC
See Your Home Before It’s Built.